[a / b / c / d / e / f / g / gif / h / hr / k / m / o / p / r / s / t / u / v / vg / vm / vmg / vr / vrpg / vst / w / wg] [i / ic] [r9k / s4s / vip] [cm / hm / lgbt / y] [3 / aco / adv / an / bant / biz / cgl / ck / co / diy / fa / fit / gd / hc / his / int / jp / lit / mlp / mu / n / news / out / po / pol / pw / qst / sci / soc / sp / tg / toy / trv / tv / vp / vt / wsg / wsr / x / xs] [Settings] [Search] [Mobile] [Home]
Board
Settings Mobile Home
/biz/ - Business & Finance

Name
Options
Comment
Verification
4chan Pass users can bypass this verification. [Learn More] [Login]
File
  • Please read the Rules and FAQ before posting.

08/21/20New boards added: /vrpg/, /vmg/, /vst/ and /vm/
05/04/17New trial board added: /bant/ - International/Random
10/04/16New board for 4chan Pass users: /vip/ - Very Important Posts
[Hide] [Show All]


[Advertise on 4chan]


File: LHC-schedule-Nov24.png (105 KB, 1746x747)
105 KB
105 KB PNG
so 3 months positive, then crash into a new reality?
>>
>>61843790
what is this?
>>
>>61843790
oh god this can't be true
>>
>>61844220
This is the CERN Large Hadron Collider (LHC) long-term schedule, spanning from 2021 to 2041. It is the official planning timeline for the LHC and its upgrade to the High-Luminosity LHC (HL-LHC), published by CERN (last updated November 2024).
What the Chart Shows
The Gantt-style chart maps out the LHC's operational periods (runs), long shutdowns, and technical activities using color-coded bars:

Color Activity
Dark blue Shutdown / Technical stop
Green Proton physics
Olive/dark green Ion (heavy-ion) physics
Peach/salmon Commissioning with beam
Light blue Hardware commissioning
Key Phases
Run 3 (2022–mid 2026): The current operational period, during which the LHC collides protons at a record centre-of-mass energy of 13.6 TeV. It has been extended until July 2026.


Long Shutdown 3 / LS3 (~mid 2026–2029): A major multi-year shutdown to install all the equipment needed to transform the LHC into the HL-LHC, including new focusing magnets, crab cavities, and upgraded detectors for ATLAS and CMS.

Run 4 (~2030–2033): The first operational run of the HL-LHC era, now planned to start around June 2030.


LS4 (~2034–2035): A mid-programme long shutdown for further maintenance and upgrades.

Run 5 (~2037–2039): A subsequent HL-LHC data-taking period.

EYETS (~2039): An Extended Year-End Technical Stop before final operations continuing into the early 2040s.

Why It Matters
The HL-LHC upgrade aims to increase the LHC's integrated luminosity by a factor of ten, vastly expanding the volume of collision data collected by experiments. This will enable physicists to study rare processes, improve precision measurements of the Higgs boson, and search for new physics phenomena well into the early 2040


this was produced by claude 4.6 opus. enjoy the astrology science themed bullshit of this dead af board, fren
>>
File: boggjoker.jpg (25 KB, 396x454)
25 KB
25 KB JPG
>>61844220
Bogdanoff revival schedule
>>
THE GATE MUST OPEN
>>
> Shutdowns actually correlate with higher average returns (+16.31%) than runs (+10.46%)
> a gap of ~5.85% in favor of the LHC being off
OMG
W A G M I
THE GOLDEN BULL OF 2026 - 2030
>>
I just took a look at lifetime schedule and whenever this shit runs my life takes a nosedive



[Advertise on 4chan]

Delete Post: [File Only] Style:
[Disable Mobile View / Use Desktop Site]

[Enable Mobile View / Use Mobile Site]

All trademarks and copyrights on this page are owned by their respective parties. Images uploaded are the responsibility of the Poster. Comments are owned by the Poster.